pinegrovedave
Member
So, the inspector came out last week, took a look at the rough out and said mechanically everything looks fine. However, he didn't pass us because I have to pressure test the vent. He explained that I need to fill the drain vent with water and he can see next time he comes out. I have an idea that I'd like to run by everyone if y'all don't mind. If I were to install 2 cleanouts in the locations identified in the pic w/ yellow ovals, then a couple Cherne Clean-Seals, fill that section w/ water and then call for an inspection, would that suffice? He said 10' feet and the main vent pipe is definitely at least 10 feet to the roof. Thoughts?