mbhoag
Member
I know codes are different in a lot of places, but in general, do pex supply lines need to have holes drilled and go through an unfinished basement ceiling joist, or can they be run under the joist and secured?
I will be running both 3/4 to manifolds for distribution, and 1/2 hot & cold lines to the fixtures on the 1st floor above.
Thanks for the help!
I will be running both 3/4 to manifolds for distribution, and 1/2 hot & cold lines to the fixtures on the 1st floor above.
Thanks for the help!