hi. looking for some advice, thanks. we’re laying down the rough of PVC on a dirt floor and then covering with 6” gravel, 2” insulation, and a 4” concrete slab.
how do I lock in the PVC so it doesn’t move around when we’re shoveling in the gravel?
I was thinking of taking 1/4” rebar and bending it to fit the OD and use it to lock in
the PVC to the ground, but maybe overthinking this? what’s the best practice?
how do I lock in the PVC so it doesn’t move around when we’re shoveling in the gravel?
I was thinking of taking 1/4” rebar and bending it to fit the OD and use it to lock in
the PVC to the ground, but maybe overthinking this? what’s the best practice?