indifferent
Member
The plumber said it will be fine but I disagree. The tub instructions say to put felt pad or mortar under the tub. They just busted the concrete from the existing drain to the other side of the tub. Then they filled it back with concrete pieces and installed tub on the top of that. The tub has ribs underneath, it seems to be very sturdy but still there are many ribs floating in the air. It is installed in basement, new construction.
https://drive.google.com/file/d/1ZYmUqnZprbvY4yhlbi-7jr8rNAdHK-Mu/view?usp=sharing
https://drive.google.com/file/d/1VcAGC0YD8uoiV-JbObwOMlUBvRmz8I6M/view?usp=sharing
https://drive.google.com/open?id=14YT25D-S_pEl9e4Wpcr4U94H23egOgpx
https://drive.google.com/file/d/1ZYmUqnZprbvY4yhlbi-7jr8rNAdHK-Mu/view?usp=sharing
https://drive.google.com/file/d/1VcAGC0YD8uoiV-JbObwOMlUBvRmz8I6M/view?usp=sharing
https://drive.google.com/open?id=14YT25D-S_pEl9e4Wpcr4U94H23egOgpx