ben
Member
I posted another tread about venting. There is a p-trap in the concrete floor. This is all just temp mock up. There will be a reasonable slope.
Question is mostly about the T where the overflow and main drain meet.
The drain was originally a shower and it drained fine.
I could run this to the other drain in the picture, but would require another 90. Plan is to use that one for a sink.
Question is mostly about the T where the overflow and main drain meet.
The drain was originally a shower and it drained fine.
I could run this to the other drain in the picture, but would require another 90. Plan is to use that one for a sink.