no_regrets
New Member
Rough-in for future toilet for bathroom in basement consists of 3” PVC nested inside 4” PVC. WTH? House built in 1997. The 3” pipe is too low for 3” flange, but high enough to block 4” flange. Can I just cut the 3” as low as possible (above weld) and use 4” toilet flange? Was this typical or someone’s bad idea on the spot and lacking correct parts?