Hello,
I have an unfinished basement and opted for the 3 piece rough in versus the 2 piece rough in. I have 3 pipes sticking out of the concrete basement floor, (1) larger one assume is toilet, (2) 12" behind the toilet along the wall is a 2" pvc pipe, (3) then in the middle of room is another...