I’m building a DIY kit pool house that will have a toilet, sink and an out door shower. There will be a ~100 4” DWV PVC run to tie into an existing detached garage main line.
My Q is about the slope for the 100’ run. I know the minimum is 1/8” per foot slope with most suggesting 1/4”. Is 1/2” too high of a slope? The 1/2” would be for the first ~70’ till a 90 (made up of two 45s 18” apart). The final 20-30’ is at 1/4”.
thanks
My Q is about the slope for the 100’ run. I know the minimum is 1/8” per foot slope with most suggesting 1/4”. Is 1/2” too high of a slope? The 1/2” would be for the first ~70’ till a 90 (made up of two 45s 18” apart). The final 20-30’ is at 1/4”.
thanks