Hi All:
New to the forum.
Here is my situation: Finishing a bathroom in our basement. Our concrete slab has hydronic heat tubing running through it. In the bathroom, I tiled the floor w/pocelain tile right up to the toilet drain stack. I am ready to install the toilet but need to know the best way to install the flange. I am real leary drilling into the tile & concrete because I don't know exactly where the heat tubing is run.
Questions:
What is the best flange type to use? (PVC rough in)
Suggestions on securing it to the floor?
I assume it can be installed on top of the tile?
Thanks in advance
FGH
New to the forum.
Here is my situation: Finishing a bathroom in our basement. Our concrete slab has hydronic heat tubing running through it. In the bathroom, I tiled the floor w/pocelain tile right up to the toilet drain stack. I am ready to install the toilet but need to know the best way to install the flange. I am real leary drilling into the tile & concrete because I don't know exactly where the heat tubing is run.
Questions:
What is the best flange type to use? (PVC rough in)
Suggestions on securing it to the floor?
I assume it can be installed on top of the tile?
Thanks in advance
FGH