Well sounds like I had a less stressful day than Chris haha, I worked at the labatt-Busch brewery here in Edmonton all day, unclogging drains. It was a nice slack day.
Today was one hell of a day. Ran 115 ft of 1" type L. Their main water supply froze in the ceiling space because it was on an outside wall so I had to re route it all the way around which wound up being 115 ft. That's by far the most copper I've installed in one day, and to top it off no leaks so I was happy about that when there's probably 50 joints. Long day but it was good.
Lol no doubt phish. Well I'd put together 3-4 fittings, solder then move on. It was all only accessible by ladder so I didn't have much choice haha. I ripped through just about a roll of solder and half a can of flux. Of course every 15 ft I had to offset because of stuff in my way but it all panned out, with no leaks so I was a happy man to say the least.