V Vattina New Member Joined Jun 7, 2021 Messages 2 Reaction score 0 Location Ohio Nov 8, 2021 #1 I am moving my kitchen sink and planning to tie the drain into the main sewer line. Is the rule 6’ or a new vent is required? And does that vent need to go all the way through the roof? Thank you!
I am moving my kitchen sink and planning to tie the drain into the main sewer line. Is the rule 6’ or a new vent is required? And does that vent need to go all the way through the roof? Thank you!
T Twowaxhack Currently in the Lab conducting research Professional Joined Feb 9, 2021 Messages 14,016 Reaction score 6,556 Location United states Nov 8, 2021 #2 Draw what you want to do. Label old pipes and the proposed piping.