Hi all,
I have what seems like a pretty straight forward project - adding a shower to a 1/2 bath. This is in Washington state, so I believe UPC prevails. I am expanding the bathroom into the garage space, and adding a shower into the new space. I plan to tie into the existing water supply to the sink and run new copper to the shower. My main concern is whether there is anything I need to be aware of when tying into the drain system. I plan to connect the shower drain to the existing sink/toilet drain. There is a vent stack in the wall and a crawl space below so I have room to work. Is this really a straight forward project like I think it should be, or are there other considerations I should be aware of?
Thanks all!
I have what seems like a pretty straight forward project - adding a shower to a 1/2 bath. This is in Washington state, so I believe UPC prevails. I am expanding the bathroom into the garage space, and adding a shower into the new space. I plan to tie into the existing water supply to the sink and run new copper to the shower. My main concern is whether there is anything I need to be aware of when tying into the drain system. I plan to connect the shower drain to the existing sink/toilet drain. There is a vent stack in the wall and a crawl space below so I have room to work. Is this really a straight forward project like I think it should be, or are there other considerations I should be aware of?
Thanks all!