Hi everyone. I'm remodeling my master bathroom and wouldike some advices to how to relocate the shower drain and how I could connect it to the main sewer line. Thanks
The location of the tape measure is where the new shower drain is proposed? How about toilet and sink? Location of new walls, Sewer main under floor, installing new water lines for shower valve? Drawings/plans?