Hi,
Currently installing 3 Gerber Fushmate toilets. The gasket between the tank and the lower unit is a bit large. There are two ridges on the lower unit to support the tank, one forward and one aft.
They supply some rubber bushings for the back but not for the front, so when tightened down the tank leans forward and is not secure. And the large gasket doesn't help either.
Anyone had this issue and a solution?
Calling Gerber, but they haven't gotten back to me yet.
PS can I attach a picture to this message?
Larryo
St. Pete Florida
Contractor
Currently installing 3 Gerber Fushmate toilets. The gasket between the tank and the lower unit is a bit large. There are two ridges on the lower unit to support the tank, one forward and one aft.
They supply some rubber bushings for the back but not for the front, so when tightened down the tank leans forward and is not secure. And the large gasket doesn't help either.
Anyone had this issue and a solution?
Calling Gerber, but they haven't gotten back to me yet.
PS can I attach a picture to this message?
Larryo
St. Pete Florida
Contractor