Greetings everyone, I am new to the forum, so please excuse me if I ramble a bit. I am presently in the tail end of a remodel on my bathroom. I want to move the location of my toilet about four feet to right of where it is now. This will get it out of sight every time the door is opened. Oh by the way, my house is elevated about ten feet off the ground so I have room to work on the drain system before it drops into the septic system.
Presently the drain from the toilet exits below the floor drops about 2 ft and ties directly to the drain and vent. Anyway, my questions center around the drop from the toilet and the distance from the vent. Is there a recommended amount of vertical drop from the toilet before I angle the drain to tie in to the existing drain system? Also should moving the drain about four feet from where it ties into the drain and vent cause a problem?
Thanks in advance for any help,
James
Presently the drain from the toilet exits below the floor drops about 2 ft and ties directly to the drain and vent. Anyway, my questions center around the drop from the toilet and the distance from the vent. Is there a recommended amount of vertical drop from the toilet before I angle the drain to tie in to the existing drain system? Also should moving the drain about four feet from where it ties into the drain and vent cause a problem?
Thanks in advance for any help,
James