We are in the process of builder a home and are putting in a shower that will have a main head, 2 body sprayers, and a hand wand all running from a diverter. In addition to that we will have another single shower head off to the side. The builder forgot to have the plumber run the second head and called him back out to add it right as we are about to start drywall. The plumber split the secondary head off of the existing plumbing for the main setup. I am wondering if we are going to run into a problem with not having enough water to make all of this worth it. Would love an opinion on if this seems right or if we need to have them run a separate line for the secondary head.
http://screencast.com/t/xXwMGrxq
http://screencast.com/t/iYveMz2ZoF
http://screencast.com/t/lxCJvZ7wsAV
Thanks for the help!
http://screencast.com/t/xXwMGrxq
http://screencast.com/t/iYveMz2ZoF
http://screencast.com/t/lxCJvZ7wsAV
Thanks for the help!
Last edited: