My house was built in the Vietnam war era, where supplies were needed more for the war effort than these stick built houses. I've been dealing with aluminum wiring, no insulation, no metal bracing, no Tico clips, no ties at all. I just keep saying to myself that I helped with the war effort! :)
 
My house was built in the Vietnam war era, where supplies were needed more for the war effort than these stick built houses. I've been dealing with aluminum wiring, no insulation, no metal bracing, no Tico clips, no ties at all. I just keep saying to myself that I helped with the war effort! :)

Well you didn't help enough considering we, ah, lost that one!! :cool:
 
Made some changes in hopes of making some of those numerous turns a bit smoother.

I guess replacing a 90 with two 45's isn't technical a change, but there must be a lower probability of a clog with a 45 instead of a 90. Or is it a waste of time??

P7160017.jpg


I'll put a Wye in for that cleanout on the vent once I get one.

This where the 2" shower drain joins 1.5" vanity. If using two 45's instead of one 90 results in a high flow velocity, then I'll put in two's 45's where it turns into and down the stack.

P7160018.jpg


Here's the vanity with different config. I hope that's what you meant for the Wye at the cleanout.

P7160016.jpg
 
I guess replacing a 90 with two 45's isn't technical a change, but there must be a lower probability of a clog with a 45 instead of a 90. Or is it a waste of time??

Looks Good

P7160017.jpg


I'll put a Wye in for that cleanout on the vent once I get one.Not really needed. You can clean a drain through the 2" p-trap

This where the 2" shower drain joins 1.5" vanity. If using two 45's instead of one 90 results in a high flow velocity, then I'll put in two's 45's where it turns into and down the stack.

Leave the 90 and Wye as they where because you had to add another 45 fronm the sink
P7160018.jpg


Here's the vanity with different config. I hope that's what you meant for the Wye at the cleanout.

Yes

P7160016.jpg

Looks good I think you've got it. Time to do the happy dance
 
Last edited:
Don't be so easy on Ajay. He has helped contribute to 85 separate posts, and sure has tranquilized me looking at all that PVC. I hate to see him say he was done with us, just like a cheap coat!
 
I should start a new thread on this one but not today.
Here's what happens when you let it leak for a long time.
I rebuilt the walls and floor and installed a new tub w/ inclosure

Tub  room rebuild (7) (800x600).jpg

Tub  room rebuild (21) (800x600).jpg
 
Looks good I think you've got it. Time to do the happy dance

You're one who should do the happy dance as you won't have to answer my stupid questions anymore.

Though I'm afraid I don't understand this comment:

"Leave the 90 and Wye as they were because you had to add another 45 from the sink"

Havasu...

"He has helped contribute to 85 separate posts,"

How is that possible has I have only 65 posts, including this one? Is that some new "fuzzy math" ya'll have resorted to out there to balance the Calif budget??
 
Here's what happens when you let it leak for a long time.

That's just nasty.

It's amazing what some people will actually live in.

I wish I taken photos of the shower in the bathroom which is the primary subject of this thread. It was pretty gross.
 
Havasu...

"He has helped contribute to 85 separate posts,"

How is that possible has I have only 65 posts, including this one? Is that some new "fuzzy math" ya'll have resorted to out there to balance the Calif budget??

This thread collected now 91 total posts within it. When you ask, someone answers. No fuzzy math on this part of the country, just alot of "No Habla English!" No amount of math will take care of our negative budget:)
 
This thread collected now 91 total posts within it. When you ask, someone answers. No fuzzy math on this part of the country, just alot of "No Habla English!" No amount of math will take care of our negative budget:)

Being dumb as a post, I somehow read that as "threads" and not "posts".

We're not as bad off here in Maryland, but in the People's Republic of Montgomery County, the county commissioners want increase spending. We're one of them "sanctuary" counties... guess there's lot of people we need to take care that aren't paying enough taxes.
 
Get off the computer and start priming and gluing, priming and gluing, etc, etc!

whatever :p

I'm going to install the supply piping first in case there is a conflict.

But before that have to install two windows first where there was only one before which will most likely require moving an HVAC vent and duct first.

Plus I want to get this thread to 150 posts!
 
Last edited:
Go for it....the experts and I (not anything close to being an expert in anything!) will be there to answer all your questions and to look at more blood and guts pics!
 
Those drains are close to the top of the floor.
Don't nail 'em when you put the floor down.

This is a job I did a few days ago.
When they set a trim pc in a hall way the set it right over the vertical drain stack.
Nailed that baby over a dozen times

1344d1310783830-converting-sink-drain-tub-022-800x600-.jpg


Sorry for bringing this beaten to death thread back to life, but how can one avoid someone doing this kind of thing in a house, especially after someone else might buy the house and not know that there is a plastic pipe behind the wall?

Is there some of metal plate that can be used to cover the entire 8 ft whatever length?
 