Hopefully a pretty simple question for most here...
I just installed single bowl sink in basement bar area. When we moved in, the section already had rough-in for drain and supply lines where in also.
What is best method now for plumbing of the sink drain? The drain pipe is 2 1/2" PVC that comes right out of the floor 16" or so. Roughed in during initial construction(2007), so is it probably vented elsewhere?? Hole for sink drain is a couple feet above it, and then offset 6" or so to the right.
Thanks for any input.
Dustin
I just installed single bowl sink in basement bar area. When we moved in, the section already had rough-in for drain and supply lines where in also.
What is best method now for plumbing of the sink drain? The drain pipe is 2 1/2" PVC that comes right out of the floor 16" or so. Roughed in during initial construction(2007), so is it probably vented elsewhere?? Hole for sink drain is a couple feet above it, and then offset 6" or so to the right.
Thanks for any input.
Dustin