Default Rough-in for concrete over PVC DWV

What is standard practice at the rough-in stage for PVC DWV piping that penetrates a slab floor? In particular, how are vents and drains terminated in (or above or below) the slab before the concrete work is done?

Are all drains/vents brought through the slab and left projecting above the level of the concrete, a foot or so? (Presumably toilet drains are then cut off to finished floor level.) Or is there some standard practice that leaves the piping at or below concrete level at rough-in, and then the piping is extended through the slab after the concrete work and structural framing are completed?

I'm an amateur with some experience with under-slab DWV plumbing but in the past have used what must be non-standard approaches to this question. (I believe I'm adequately informed/experienced with pipe sizing and pipe layouts including under-slab practices, and can satisfy local building codes.)



__________________
jmprPF is offline  
 
Reply With Quote Quick reply to this message
Old 03-01-2011, 12:04 AM   #2
phishfood
Moderator
PLF_MODERATOR.png
 
Join Date: Jan 2010
Location: Orlando, FL
Posts: 4,390
Liked 479 Times on 391 Posts
Likes Given: 640

Default

Water closets a few inches above the concrete, sink, lavatory, and laundry drains and vents ~24" above. The only time I terminate flush with concrete is in types of construction that utilize rollout forms for pouring upper floors.

Under slab rough-in can seem deceptively simple, but it is really easy to screw up. And with layoffs rampant in building departments as local governments try to balance their budgets, don't count on the inspector to catch every issue. If you have a question, do not hesitate to ask us.



__________________
phishfood is offline  
 
Reply With Quote Quick reply to this message
Old 03-01-2011, 06:07 PM   #3
PrecisionPlumbing
Master Plumber
 
PrecisionPlumbing's Avatar
 
Join Date: Feb 2011
Location: Dallas, Texas
Posts: 17
Default

all piping needs to be sleeved in plasic where concrete will touch and stubbed 24" above the floor

__________________
www.Precision-Plumbing.com
‎(469)-248-2136 Precision Plumbing providing Service Repair Remodels Installing Quality Products With a Best Rate, Best Warranty Guarantee! Serving the Dallas,Texas DFW MetroPlex for Over 10 Years! Clean job sites, Quality work. Service You Can Trust! M-39887
PrecisionPlumbing is offline  
 
Reply With Quote Quick reply to this message
Old 03-08-2011, 03:44 PM   #4
jmprPF
Junior Member
 
Join Date: Feb 2011
Location: Charlottesville, Virginia
Posts: 4
Default

Thanks for the help with this topic!

__________________
jmprPF is offline  
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Do I need a plumber or a concrete guy? Chubba General Plumbing Help 1 07-22-2011 11:33 PM
Making a hole in concrete slab downtownguy General Plumbing Help 5 05-06-2011 08:27 PM
Bathtub on Concrete Slab supert160 Showers and Tubs 1 03-01-2011 06:09 PM
Concrete Wall in Shower jasmiesharris Showers and Tubs 10 02-03-2011 02:02 AM
Making a concrete sink. Chris Toilets and Sinks 6 04-24-2010 01:54 PM