Hello;
I'd like to move a toilet on our main floor, the new position would put both toilets in line of each other then the stack (toilet, toilet, stack). Can I connect the two toilets together then tie to the stack and if so what are the venting requirements? First toilet is 8' from the stack, the second toilet is 1.5' from the stack.
Thanks.
I'd like to move a toilet on our main floor, the new position would put both toilets in line of each other then the stack (toilet, toilet, stack). Can I connect the two toilets together then tie to the stack and if so what are the venting requirements? First toilet is 8' from the stack, the second toilet is 1.5' from the stack.
Thanks.