HackingHowie
New Member
I'm building a camp up north and we've run out of money a long time ago, So I've gotta do a lot of work myself that I'd ordinarily farm out. The DWV is one of the projects I'd like to do myself. However I would like to do it right. This forum looks like a great place to find solutions and answers to some of the upcoming problems I'm sure to encounter. The Camp was really just put together fast without plans with not a lot of thought on interior layout so now things look a bit more complicated than maybe they could have been. It's a 1& 1/2 story gable structure on a full foundation. (So there's really three levels) A professional plumber roughed in the bathroom in the slab of the walk out basement So I'm off to a good start. I'd like to install a 1/2 bath and a slop sink on the top floor there will be no bathroom on the middle floor. There is a 4" PVC stub coming out of the slab and it's headed upstairs. Here's my first question. Can this stack be offset to get it near where I need it to be for the 1/2 bath and where I would like it be when it exits the roof?