I always aim for about 1 1/2" off center with the drain line stubout, to make hooking up the Ptrap easier. And I try to make the stubout straight.
Bring the vent as high as possible before offsetting sideways. There is a code requirment that the vent be at least 6" above the rim of the sink before it goes horizontal.
You should be fine using compression stops on copper.