Hi,

I am replacing/moving tub and toilet in my basement bathroom. I would appreciate anyone's input/thoughts/suggestions before I pour the concrete back in :-)

Link to a labeled pic:
http://reimann.files.wordpress.com/2011/09/basement-bathroom-plumbing.jpg

Thanks!!

snucky is offline   Reply With Quote
Old 12-16-2011, 12:56 AM   #2
Senior Member
 
johnjh2o's Avatar
 
Join Date: Jul 2011
Location: , Florida, East-Central
Posts: 1,089
Default

You need to vent the tub. The tub drain including the trap should be 2" then reduced after the trap. The vent for the toilet can not run horizontal below the flood rim of the fixtures and you can't lay the sanitary tee flat. I'm afraid it wouldn't pass any inspection.

John
johnjh2o is offline   Reply With Quote
Old 12-16-2011, 01:33 PM   #3
Junior Member
 
Join Date: Sep 2011
Location: Bozeman, MT
Posts: 14
Default

Hi John, thanks for your help. I am going to try to get more details out of you, if that's okay:

Quote:
Originally Posted by johnjh2o View Post
You need to vent the tub.
Did you see the 2" roof vent that is located very closely to the tub drain, on its way to the main stack? It's within 3 feet of the trap. Is that not close enough?

Quote:
Originally Posted by johnjh2o View Post
The tub drain including the trap should be 2" then reduced after the trap.
I will change that! Thanks!

Quote:
Originally Posted by johnjh2o View Post
The vent for the toilet can not run horizontal below the flood rim of the fixtures and you can't lay the sanitary tee flat.
Would it suffice if I rotated the sanitary tee 45 or 90 degrees upward (so that it faces the ceiling) and then got another matching elbow so that I could continue the direction outlined in my picture?

Thank you!!
snucky is offline   Reply With Quote
Old 12-16-2011, 02:21 PM   #4
Senior Member
 
johnjh2o's Avatar
 
Join Date: Jul 2011
Location: , Florida, East-Central
Posts: 1,089
Default

I have a question for you. What is connected to the upstream side of your work? And what was the existing 2" vent for. If it is for a toilet on the upstream side of your work then you can not connect anything between the existing toilet and it's vent. You must connect your work beyond that 2" vent.

John
johnjh2o is offline   Reply With Quote
Old 12-16-2011, 04:27 PM   #5
Junior Member
 
Join Date: Sep 2011
Location: Bozeman, MT
Posts: 14
Default

Hi John, this is a remodel project and the 2" vent is part of the layout how it was prior to me moving the fixtures. Before, the vent was there for the shower (now tub)

I'm not 100% sure what's behind that but the main stack is only another five feet from the Main stack so I am guessing that it just goes into the main stack.

Does that answer your question?
snucky is offline   Reply With Quote
Old 12-16-2011, 08:20 PM   #6
Senior Member
 
johnjh2o's Avatar
 
Join Date: Jul 2011
Location: , Florida, East-Central
Posts: 1,089
Default

What I'm asking is what is on the upstream side of your work. Not the side the 2" vent is on.

John
johnjh2o is offline   Reply With Quote
Old 12-17-2011, 03:11 AM   #7
Senior Member
 
Join Date: Apr 2011
Location: , Alberta
Posts: 743
Default

you cant reduce like that, it has to be the same size untill it hits the 3" how else would you auger it should you need to ? and a blockage would occur where it to reduce, once one size it must stay that size or increase.. it seems strange but even the 3" double wye would fail because it increases without means to properly clean out the brancg.

shower not vented.. fail code.
T used to connect Drainage./ fail code.

IF the T was a wye it could vent the toilet provided it be rolled so that the vent outlet be above the horizontal centerline of the 3" branch and equipped with a cleanout to serve it. minimum 2" below flood rim and served by a minimum 2"m cleanout.
Canadian Code.

and as john has asked, what is coming from the upstream side ? ( what fixtures drain to the building drain before this unfinished bathroom project.)
LiQuId is offline   Reply With Quote
Old 12-17-2011, 01:46 PM   #8
Junior Member
 
Join Date: Sep 2011
Location: Bozeman, MT
Posts: 14
Default

hi guys, thanks for your help.

about the upstream: there is some drainage coming from the upstairs. Those fixtures are separately vented.

about the the tub: how would I properly vent this?
snucky is offline   Reply With Quote
Old 01-04-2012, 10:21 PM   #9
Junior Member
 
Join Date: Jan 2012
Location: portland, oregon
Posts: 1
Send a message via Skype™ to Gorgonzola
Default

thats not very good. i recommend a different kind of caulk
Gorgonzola is offline   Reply With Quote
Old 01-04-2012, 11:10 PM   #10
Moderator
 
Join Date: Jan 2010
Location: Orlando, FL
Posts: 2,270
Default

I don't see how a different caulking is going to fix a venting problem.

phishfood is online now   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On



Latest Threads

Latest Reviews

MCC USA Inc. - CornerWrench

PASCO - Ez On Basket
Strainer - Brushed Nickel

PASCO - EZ On Basket
Strainer - Satin

Rheem - SolPak

Whirlpool - Du1300xtvq


Copyright © Group Builder, Inc - All Rights Reserved
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.6.0
Network: Flooring Forum - Home DIY Forum - Garage Forum - Painting Forum